MONITORS

Go Back

WFR Monitor Specifications for WFR-16000C

  • Monitor stand shall be sized for a minimum flow rate 4000 USGPM.
  • Pipe materials shall be of carbon steel construction conforming to ASTM A53 Grade B or approved equal.
  • Copper alloys of any type shall not be utilized in the construction of the monitor and nozzles.
  • Base of monitor shall terminate in a 150# flat faced flange complying to ASTM A105 and ANSI B16.5. Flange shall be weld neck type of forged construction.
  • Locking type swivel joints shall provide 360º rotation about a vertical axis and a minimum -45º down inclination and 100º up inclination about a horizontal axis. Swivel joints shall provide a thread operated locking device capable of fixing the monitor orientation in any operation position. Locking device shall be capable to hold monitor orientation under full flow thrust pressures in combination with maximum wind loading based on a 120 km/hr gust loading.
  • Locking device operation shall be able to be accomplished with gloved hands. No tool or wrench device shall be required to accomplish lock operation. Serrated know or wheel operation is preferred.
  • Swivel joints shall be fitted with pressure nipple type fitting for lubrication. Swivel joint shall be of double seal construction incorporating stainless steel ball bearing joints of leak-proof construction. Swivel joints shall be of non-rusting construction.
  • Monitor shall be fitted with an operating bar complete with elastomeric type grip. Operating bar shall provide a minimum 460mm projection as measured perpendicular to axis of vertical and/or horizontal swivel joint whichever provides the longest bar extension.
  • Monitor discharge end shall terminate in a stainless steel type 304, 2½" Higbee cut type thread with 8 threads to the inch providing a male O.D. of 3.000" and a male root of 2.825". Station monitor shall be epoxy finish inside and out for corrosion protection. Colour shall be red.
Paint Specifications:
  1. Preparation--All component parts are sandblasted inside and out to remove weld scale and protective coatings. All surface areas are thoroughly cleaned to a textured metal surface. All parts are inspected after sandblast to ensure a 100% clean surface area. After sandblast, the discharge thread and interior swivel areas are taped off to eliminate over spray on these surfaces.
  2. Painting takes place within 8 hours of sandblast to ensure no surface area oxidation or contamination occurs. A red polyester powder is applied with a "powder" gun and modified "flex" attachments to ensure a thorough coating, both inside and out. The component parts are hanging by wire on racks that are then pushed into a 12x24' oven. The metal wheels are guided to metal tracks to ensure a consistent electrical charge. The electrical charge is applied over a 20 minute period ( two times the minimum time for curing the paint). The oven is preheated and set at 400º Fahrenheit. The powder paint particles are melted by the heat and "fused" to the raw metal surface by the electrical charge. This process yields a superior corrosion resistant finish that will not chip or peel as the particles have been fused together. The surface thickness is .003-.004. Heavier and/or thicker items require additional cure times and are baked accordingly. After parts are allowed to cool a 100% inspection is made on all component parts.
  3. WFR uses a fuller O'Brien powder #PFR-400-59 "Red Baron" which complies with NFPA paint finish specifications. This is a red polyester/polyurethane finish for outside usage in potentially corrosive environments. Some additional features include a surface hardness that is weather temperature range compatible with chemical and solvent resistant characteristics.

Back to Top
Click here to go to WFR's Home Page
Copyright © WFR Wholesale Fire & Rescue Ltd.